Mersin-Adana-Osmaniye-Gaziantep High Speed Train Project

Project Information

The high-speed train project connecting 4 cities includes a total of 86 under/overpasses, 256 culverts, 43 bridges/viaducts, 13 tunnels and 21 stations. In addition, this mega project includes approximately 35 M m3 excavation/fill, 1.9 M m3 ballast, 77 thousand tons of rails, and 1 million sleepers along the line. It is at a very important point for the railway sector with the rehabilitation of the existing line, the construction of new lines, hundreds of art structures and city crossings.